I am facing an issue / a limitation with LinkedIn company pages data.
So basically we are gathering LinkedIn post data in a Google Sheet using Supermetrics. We are looking at the following:
- Week over week performance: Nb of posts (“updates”) we published on LinkedIn + some other metrics (nb of impressions, nb of interactions, engagement rate etc.)
- Post-level performance: How each of the posts performed (same metrics but on a post level + the link to the visual that we then use for design insights)
Now here is my issue: The “Date” field is actually not giving me the date the post went online, but the date that it has been scheduled. We rely on the LinkedIn scheduling functionality as the posting is done by a working student only working 2-3 days per week. So we end up having posts attributed to the wrong day & week.
Would be great to have the actual posting date shown - could you guys look into that?
